I will have all the latess news later tonight
sorry for the delay
Rick
This is a blog for Rocket guys by Rocket guys. The ARC was formed to introduce and educate the public about both low and high power rocketry. We love to build rockets, both large and small. We want to expand the sport,pass on the knowhow that we have learned, and hopefully get some from others to also pay it foward. Some like to keep it to themselves. We hope to get people reinterested in space and the importance of math,and science in school.
Jun 3, 2011
May 31, 2011
May 24, 2011
TIPS
Here are more tips for all to read, and pick up some new or old tricks
Thanks Chris
http://modelrocketbuilding.blogspot.com/2011/05/estes-saturn-v-build-part-41-parachutes.html
Thanks Chris
http://modelrocketbuilding.blogspot.com/2011/05/estes-saturn-v-build-part-41-parachutes.html
May 21, 2011
NASA phone call today
FYI for everyone who may check in daily, I had a nice phone call from Mr. Chris Rink today. He is the NASA public relations contact at the Hampton , VA. Base. He was at the MLAS launch in 2008, which is cool.
He was very interested in the MLAS project and will be keeping tabs on us. I for one am thrilled at the amount of exposure the project is getting. He expressed his support and said there were some people that might be of service to us. He is going to ask around and get back to me sometime next week.
There has been other company's interested in the project, for teaching purposes, which is one of the reasons we are working so hard on the details.
As I explained to Chris, the plan is to duplicate all the events as they happened on the flight. From the boost skirt drag separation to the re-orientation chutes and the CM separation. Although I think the timing on the Shroud- CM separation will be shorter than the original.
As many of you know Team ARC flew the 8" model this past Saturday with success.
We are working on the boost and coast skirts this weekend and are trying to get the 2ft model ready for NSL in a few weeks?? We will keep pictures and postings coming regulary, along with as much information as possible.
I will be posting notes from this week’s round table. Also I will be adding pictures of the construction of the shroud. We are starting that tomorrow.
Thanks for all the visits to the blog, it is getting more traffic than I imagined.
Also please feel free to follow by clicking the follow button on the top of the home page,
GO BIG OR GO HOME
Rick "Scratch" McKee
Nar 87253 L3
SSS # 506
He was very interested in the MLAS project and will be keeping tabs on us. I for one am thrilled at the amount of exposure the project is getting. He expressed his support and said there were some people that might be of service to us. He is going to ask around and get back to me sometime next week.
There has been other company's interested in the project, for teaching purposes, which is one of the reasons we are working so hard on the details.
As I explained to Chris, the plan is to duplicate all the events as they happened on the flight. From the boost skirt drag separation to the re-orientation chutes and the CM separation. Although I think the timing on the Shroud- CM separation will be shorter than the original.
As many of you know Team ARC flew the 8" model this past Saturday with success.
We are working on the boost and coast skirts this weekend and are trying to get the 2ft model ready for NSL in a few weeks?? We will keep pictures and postings coming regulary, along with as much information as possible.
I will be posting notes from this week’s round table. Also I will be adding pictures of the construction of the shroud. We are starting that tomorrow.
Thanks for all the visits to the blog, it is getting more traffic than I imagined.
Also please feel free to follow by clicking the follow button on the top of the home page,
Rick "Scratch" McKee
Nar 87253 L3
SSS # 506
May 16, 2011
New building tips
For more modeling tips visit the website below, this guy has skills.
http://modelrocketbuilding.blogspot.com/
Rick
http://modelrocketbuilding.blogspot.com/
Rick
Project update as of May 16th, 2011
to start we have completed the CM and applied a coat of wood filler to it.
We also started on the coast skirt construction, we have made the fin templet and cut one for mock up, to this we also cut the slots for the drag platesand inserted them for a test fit.
These drag plates are made out of the 3/8 honeycomb material we have. This material will also serve as the motor cage base. Usin this honeycomb material will help keep the skirt true ( ROUND).
The motors will be 20 degrees off center and canted towards the center, just like the real one. We feel the HCM will be adequate for the power we are using.
Update #2
We flew the 8inch version this Saturday, it flew very well, I will post pictures later tonight. But wew have a youtube video you can view.http://www.youyube.com/watch?v=WC2mZaaMfx&feature=youtube gdata player
As you can see in the video it flew well, the skirts came off as expected. I know the shroud was not to scale. But we are making a new one as I write this. The new one will be closer to scale, with the two different angles on the lower portion of the shroud.
Other progress has been with the smaller model we have added more nose weight and will fly it again soon.
These are pictures that I have right now. Please keep looking for more.
More later
Rick "SCRTACH" McKee
These are a fev more pictures showing the material we have. This is Very strong and light
A 6"X 6" piece weighs less than 50 grams
These are a fev more pictures showing the material we have. This is Very strong and light
A 6"X 6" piece weighs less than 50 grams
![]() |
| This is a picture of one of the drag plates installed |
![]() |
| The layout of the boost skirt with the hooneycomb material |
|
| This is showing the thickness of the hooneycomd 3/8 " |
May 10, 2011
More pictures and updates
These are just a few of the pictures. I have added the ones we took this past weekend to my picasa page.
to view them just click on the slideshow and select the folder you want.
Thanks for visiting.
Scrtach
to view them just click on the slideshow and select the folder you want.
Thanks for visiting.
Scrtach
Model building tips
This link is great
http://modelrocketbuilding.blogspot.com/2011/05/dfr-tech-delta-ii-build-finished_10.html
Have fun
Rick
http://modelrocketbuilding.blogspot.com/2011/05/dfr-tech-delta-ii-build-finished_10.html
Have fun
Rick
May 9, 2011
Emails, and contact info
Please leave your e-mail and contact information. I am putting a contact list together for any and all rocketry information.
Please goto http://www.arizonarocketconsortium.org/ or Arizonarocketconsortium@yahoo.com an shoot me an e-mail
Thanks
Rick.
Please goto http://www.arizonarocketconsortium.org/ or Arizonarocketconsortium@yahoo.com an shoot me an e-mail
Thanks
Rick.
May 5, 2011
More Pictures of the build
Here are a few of the pictures that we have taken over the past week.
We have more on the Picasa page under Construction of the MLAS folder.
OK here are some of the details from the past week.
1. We have completed the rough cut of the CM, we still have to remove about 1/2" of material (more blue snow) Once that is completed we will add a filler and wait for it to dry.
2. The boost, and coast skirts have been cut to size, We have a small piece left form the tube we were given by White cap , this will be used as the bottom of the shroud.
3. I have laid out the boost skirt motor placements and we figured out how to support the motors. The plan is to use the 3/8” honeycomb material I had in the shop.
4. Honeycomb material is a sandwich of 3/8 octagon with a fiberglass outer shell. This material is used in the flooring of commercial airliners (VERY STRONG) and light.

5. I have the stations for the shroud figured out and will begin the laying out of the pattern tomorrow. I will do this on a piece of cardboard so I can change things as needed. 6. We have decided to do the shroud in three pieces, this will allow us to hollow out some of the shroud and keep some solid. Also this will allow us to use the same lathe setup.
7. We are being very careful on weights and the materials we use. Also in regard to the strength of a material
8. Shon and I are working on the Barrowman Equations for the rocket, this is so we can combine and check each other.
9. We still have not decided what to use for the fin material.
10. We plan on launching the 8”this weekend; I have added 6 oz of nose weight to the shroud.
Now its nose heavy
There were some minor repairs that were needed, they will be completed today. Then we will repack the chutes and prep for launch Saturday afternoon.
Some of the details are as follows
Weights
Boost skirt as of yesterday 8.6 lbs
Coast skirt as of yesterday 3.8 lbs
CM 12.6 lbs
(the CM still has the lathe hardware attached)
Subscribe to:
Posts (Atom)












