Here is the finished Rocket VERY NICE
http://modelrocketbuilding.blogspot.com/2011/06/estes-saturn-v-build-finished.html
Rick McKee
This is a blog for Rocket guys by Rocket guys. The ARC was formed to introduce and educate the public about both low and high power rocketry. We love to build rockets, both large and small. We want to expand the sport,pass on the knowhow that we have learned, and hopefully get some from others to also pay it foward. Some like to keep it to themselves. We hope to get people reinterested in space and the importance of math,and science in school.
Jun 13, 2011
Jun 7, 2011
Arizona Rocket Consortium.org: Magazine Article
Arizona Rocket Consortium.org: Magazine Article: "Author: Adam Klawonn PRINT Issue: May, 2011, Page 128
Photos by Harrison Hurwitz
The space race may be over, but one group of V..."
Photos by Harrison Hurwitz
The space race may be over, but one group of V..."
More tips and video
These are good for schools to watch and learn from
http://modelrocketbuilding.blogspot.com/2011/05/launch-schoolyard-may-25-
lhttp://modelrocketbuilding.blogspot.com/2011/06/launch-schoolyard-june-6-2011.html
Rick
http://modelrocketbuilding.blogspot.com/2011/05/launch-schoolyard-may-25-
lhttp://modelrocketbuilding.blogspot.com/2011/06/launch-schoolyard-june-6-2011.html
Rick
Mlas update 6-7-2-11
Well here I am finally updating the progress of the half scale MLAS project.
To start I would like to give a shout out to Gordy from Roachworks Machinery, he quickly rendered me a scale pdf for the shroud. Thank you Gordy for your help with our project.
To start we have completed the CM areas, and are currently working on producing clamps from the glass and screen we have in the shop. We have made a few clamps.
Here in the process
1. We start with a heave glass matt and a blue foam form or plug.
2. To this we spray glue to the blue foam and add wax paper
3. We then mix up some epoxy from Sticky Stuff here in Phoenix, Az.
4. This is structural epoxy with a 90 minute cure time
5. We then sandwich a layer of wire mesh in between the two layers of matt.
6. We then vacuum bag all this and let set of a day.
7. Remove and trim
8. Drill the needed holes and you are ready for assembly
9. The mold is at a 70 degree angle for our build
10. We then test fit all the parts and save a pieces for testing.
As many of you know we have been working on this project for about a year, we have been in touch with NASA, McDonald Douglas, Lockheed Martian, Go Daddy, and others. We have had a huge amount of help on this project, to all who have helped,
I say thank you.
Shon brought the model to the SSS social this past weekend, but there were only three members at this meeting, it seems to me more has to be done to get the membership involved. The membership needs something to make them want to attend the monthly socials. Maybe a contest, Craftsmanship, or scale, a list of parts that can only be used with a time period, Something that everyone can afford to do.
We also have been busy melting billets of lead for the weight needed in the nose. This part sucks but it has to happen. As with the 8 inch model we had to add a far amount of nose weight to make things work like they are intended too.
This flight will be no different, we plan on four K-550s for the two ft model, and these will be canted at the realistic 20 degrees from centerline. Also we plan on having electronics in this flight, controlling the chutes to the shroud and CM parachutes. Guy also has timers we will be using for the coast skirt separation sequence and chute deployment.
Now that we have the designs from Gordy we will detail the Shroud and get it ready for paint. The one thing we are making sure of is that we get this project as close to the original as possible. Being that this rocket has only flown once before we feel it is only right to make this as close as we can.
I also have plans for the new launch pad that we will be using. these will be in the next updates later this week.
Again, thanks too all who read this
Rick M
Jun 3, 2011
May 31, 2011
May 24, 2011
TIPS
Here are more tips for all to read, and pick up some new or old tricks
Thanks Chris
http://modelrocketbuilding.blogspot.com/2011/05/estes-saturn-v-build-part-41-parachutes.html
Thanks Chris
http://modelrocketbuilding.blogspot.com/2011/05/estes-saturn-v-build-part-41-parachutes.html
May 21, 2011
NASA phone call today
FYI for everyone who may check in daily, I had a nice phone call from Mr. Chris Rink today. He is the NASA public relations contact at the Hampton , VA. Base. He was at the MLAS launch in 2008, which is cool.
He was very interested in the MLAS project and will be keeping tabs on us. I for one am thrilled at the amount of exposure the project is getting. He expressed his support and said there were some people that might be of service to us. He is going to ask around and get back to me sometime next week.
There has been other company's interested in the project, for teaching purposes, which is one of the reasons we are working so hard on the details.
As I explained to Chris, the plan is to duplicate all the events as they happened on the flight. From the boost skirt drag separation to the re-orientation chutes and the CM separation. Although I think the timing on the Shroud- CM separation will be shorter than the original.
As many of you know Team ARC flew the 8" model this past Saturday with success.
We are working on the boost and coast skirts this weekend and are trying to get the 2ft model ready for NSL in a few weeks?? We will keep pictures and postings coming regulary, along with as much information as possible.
I will be posting notes from this week’s round table. Also I will be adding pictures of the construction of the shroud. We are starting that tomorrow.
Thanks for all the visits to the blog, it is getting more traffic than I imagined.
Also please feel free to follow by clicking the follow button on the top of the home page,
GO BIG OR GO HOME
Rick "Scratch" McKee
Nar 87253 L3
SSS # 506
He was very interested in the MLAS project and will be keeping tabs on us. I for one am thrilled at the amount of exposure the project is getting. He expressed his support and said there were some people that might be of service to us. He is going to ask around and get back to me sometime next week.
There has been other company's interested in the project, for teaching purposes, which is one of the reasons we are working so hard on the details.
As I explained to Chris, the plan is to duplicate all the events as they happened on the flight. From the boost skirt drag separation to the re-orientation chutes and the CM separation. Although I think the timing on the Shroud- CM separation will be shorter than the original.
As many of you know Team ARC flew the 8" model this past Saturday with success.
We are working on the boost and coast skirts this weekend and are trying to get the 2ft model ready for NSL in a few weeks?? We will keep pictures and postings coming regulary, along with as much information as possible.
I will be posting notes from this week’s round table. Also I will be adding pictures of the construction of the shroud. We are starting that tomorrow.
Thanks for all the visits to the blog, it is getting more traffic than I imagined.
Also please feel free to follow by clicking the follow button on the top of the home page,
Rick "Scratch" McKee
Nar 87253 L3
SSS # 506
May 16, 2011
New building tips
For more modeling tips visit the website below, this guy has skills.
http://modelrocketbuilding.blogspot.com/
Rick
http://modelrocketbuilding.blogspot.com/
Rick
Project update as of May 16th, 2011
to start we have completed the CM and applied a coat of wood filler to it.
We also started on the coast skirt construction, we have made the fin templet and cut one for mock up, to this we also cut the slots for the drag platesand inserted them for a test fit.
These drag plates are made out of the 3/8 honeycomb material we have. This material will also serve as the motor cage base. Usin this honeycomb material will help keep the skirt true ( ROUND).
The motors will be 20 degrees off center and canted towards the center, just like the real one. We feel the HCM will be adequate for the power we are using.
Update #2
We flew the 8inch version this Saturday, it flew very well, I will post pictures later tonight. But wew have a youtube video you can view.http://www.youyube.com/watch?v=WC2mZaaMfx&feature=youtube gdata player
As you can see in the video it flew well, the skirts came off as expected. I know the shroud was not to scale. But we are making a new one as I write this. The new one will be closer to scale, with the two different angles on the lower portion of the shroud.
Other progress has been with the smaller model we have added more nose weight and will fly it again soon.
These are pictures that I have right now. Please keep looking for more.
More later
Rick "SCRTACH" McKee
These are a fev more pictures showing the material we have. This is Very strong and light
A 6"X 6" piece weighs less than 50 grams
These are a fev more pictures showing the material we have. This is Very strong and light
A 6"X 6" piece weighs less than 50 grams
![]() |
| This is a picture of one of the drag plates installed |
![]() |
| The layout of the boost skirt with the hooneycomb material |
|
| This is showing the thickness of the hooneycomd 3/8 " |
Subscribe to:
Posts (Atom)







